Case Studies
-
Kingsford Homes –
Stripe Road Rossington

- Client
- Kingsford Homes
- Project
- Dismantling water tower
- Duration
- 2 Weeks
-
Yorkshire Horticultural
– Finningley

- Client
- Yorkshire Horticultural Ltd
- Project
- Composting operations, processing 48,000 tonnes of Green Waste
- Duration
- 12 month contract
-
Yorkshire Aggregates –
Junction 4 M18

- Client
- Yorkshire Aggregates Ltd
- Project
- Crushing and screening for Yorkshire Aggregates Ltd.
40,000 tonnes of 6f2 crushed.
20,000 tonnes of fill sand screened.
- Duration
- Ongoing contract
-
Doncaster Rugby Club

- Client
- Cadman Construction
- Project
- Demolition of old spectators stand – redevelopment of the new stand
- Duration
- 6 Weeks
-
Robin Hood Airport – Doncaster

- Client
- Robin Hood Airport Doncaster Sheffield
- Project
- Snow and ice clearance from runways and airport base
- Duration
- On-call contract, ongoing
-
Penistone Grammar School

- Client
- Carillion
- Project
- Construction of synthetic sports pitches for Carillion. Preparation of sports pitches using laser guided dozer.
- Duration
- 8 Weeks
-
Normanton Medical Centre

- Client
- Rok Construction
- Project
- Earthworks for a new medical centre
- Duration
- 12 Weeks
-
Yorkshire Aggregates
– Maltby

- Client
- Yorkshire Aggregates
- Project
- Processing of waste, brick and concrete
- Duration
- 8 Weeks
-
Yorkshire Horticultural

- Client
- Yorkshire Horticultural Ltd
- Project
- Preparation of new concrete slab to be used for composting operation
- Duration
- 12 Weeks
-
Aggregates R Us
– Wroot Road Finningley

- Client
- Aggregates R Us Ltd
- Project
- Construction of new loading bays
- Duration
- 2 Weeks